East Lake Sammamish Trail Design
 

King County, WA

 
 

Federal Award: $1,460,000.00

 
 

Local Match: $228,106.00

 
 

Total Cost: $1,688,106.00

 
 

Year Programmed: 1999

 
 

TE Category 8

 

Description (Limited to 255 characters)

 
 

This project will fund preliminary studies and design engineering for the East Lake Sammamish Project is the design only for a 12 foot wide, paved surface with 2 foot wide soft shoulders along an 11 mile cooridor enhanced with native vegetation from Mary